In addition to the projects listed below, Bond 2008 includes new computers, phones, other technology equipment and an allowance for capital equipment (copiers, furniture, etc.), at each facility.

Arrowwood Elementary
Hemmeter Elementary
Plainfield Elementary
Sherwood Elementary
Weiss Elementary
Westdale Elementary

White Pine Middle School
Heritage High School

Use the subscribe option on this page to receive email notices as new information is posted.


 

Arrowwood Elementary School

Remodeling

•·   Security upgrades
•·   Remodel main entrance to upgrade security
•·   Upgrade classroom heating and ventilating system
•·   Roof replacement
•·   Carpet replacement
•·   Fire alarm system upgrade
•·   Kitchen remodeling
•·   Electrical upgrades
•·   Gym and commons floor replacement
•·   Gym lighting replacement
•·   Additional computer outlets in classrooms
•·   Upgrade temperature control system for energy management savings
•·   Asbestos removal from piping
•·   Technology upgrades



Hemmeter Elementary School

Building Addition

•·   New main entrance to upgrade security

Remodeling

•·   Security upgrades
•·   Roof replacement, south wing
•·   Carpet replacement
•·   Fire alarm system upgrade
•·   Exterior door replacement
•·   New corridor lockers
•·   Gym floor replacement
•·   Select masonry restoration
•·   Interior door replacement
•·   Additional computer outlets in classrooms
•·   Upgrade temperature control system for energy management savings
•·   Exterior lighting upgrades
•·   Emergency lighting in gymnasium
•·   Bathroom exhaust fan replacement
•·   Technology upgrades


Site Improvements

•·   Parking lot re-paving
•·   Storm drainage improvements



Plainfield Elementary School

Building Addition

•·   New main entrance to upgrade security

Remodeling

•·   Security upgrades
•·   Roof replacement
•·   Fire alarm system upgrade
•·   Carpet replacement
•·   Upgrade heating and ventilating system in music room and other select areas
•·   Upgrade temperature control system for energy management savings
•·   Replace bathroom exhaust fans
•·   Electrical upgrades
•·   Replace exit and egress lighting
•·   Additional computer outlets in classrooms
•·   Technology upgrades




Sherwood Elementary School

Building Addition

•·   New main entrance to upgrade security

Remodeling

•·   Security upgrades
•·   Roof replacement
•·   Upgrade classroom heating and ventilating system
•·   Carpet replacement
•·   Exterior door replacement
•·   Fire alarm system upgrade
•·   Classroom sink casework replacement
•·   Bathroom remodeling
•·   Locker room remodeling
•·   Media center/computer room remodeling
•·   Kitchen remodeling
•·   Upgrade electrical panels
•·   Upgrade temperature control system for energy management savings
•·   Asbestos removal from H&V rooms and piping
•·   Additional computer outlets in classrooms
•·   Technology upgrades

Site Improvements

•·   Parking lot re-paving
•·   Storm drainage improvements



Weiss Elementary School

Building Addition

•·   New main entrance to upgrade security
•·   Gym storage addition

Remodeling

•·   Security upgrades
•·   Carpet replacement
•·   Classroom sink and vanity replacement
•·   Fire alarm system upgrade
•·   Bathroom remodeling
•·   Upgrade heating and ventilating system in select areas
•·   Kitchen remodeling
•·   Replace site lighting and controls
•·   Gym remodeling and upgrades
•·   Upgrade temperature control system for energy management savings
•·   Replace select bathroom exhaust fans
•·   Replace plumbing fixtures
•·   Additional computer outlets in classrooms
•·   Technology upgrades

Site Improvements

•·   Parking lot re-paving




Westdale Elementary

Building Addition

•·   New main entrance to upgrade security

Remodeling

•·   Security upgrades
•·   Roof replacement
•·   Building window replacement for energy conservation
•·   Carpet replacement
•·   Fire alarm system upgrade
•·   Replace corridor lockers
•·   Gymnasium fascia replacement
•·   Upgrade heating and ventilating system in gym, administration, kitchen, and corridors
•·   Bathroom exhaust fan replacement
•·   Replace plumbing fixtures
•·   Upgrade temperature control system for energy management savings
•·   Electrical upgrades
•·   Selective lighting replacement
•·   Central clock and PA replacement
•·   Additional computer outlets in classrooms
•·   Technology upgrades

Site Improvements

•·   Parking lot repaving
•·   Storm drainage improvements



White Pine Middle School  

Building Addition

•·   Expand the cafeteria and kitchen to meet current health department and ADA requirements
•·   New secure entrances for East, West and South Halls

Remodeling

•·   Security upgrades
•·   Fire alarm system upgrade
•·   Carpet replacement
•·   Exterior door and window replacement
•·   Asbestos abatement
•·   Remodel swimming pool area
•·   Remodel locker rooms
•·   Remodel the Auditorium including new seating
•·   Remodel the present Centers Building Media Center ceiling
•·   Remodel Centers Building, Kitchen, Servery, Cafeteria
•·   Floor tile replacement
•·   Interior door replacement
•·   North Hall pool roof replacement
•·   Upgrade temperature control system for energy management savings
•·   Swimming pool ventilation replacement
•·   Exit and egress lighting replacement
•·   Additional computer outlets in classrooms
•·   Technology upgrades

Site Improvements

•·   Parking lot re-paving and expansion
•·   Site lighting replacement
•·   Sidewalk replacement
•·   Upgrade tennis courts
•·   Upgrade track surface
•·   Replace bleachers with ADA-approved bleachers and add press box at stadium





Heritage High School

Remodeling

•·   Security upgrades
•·   Roof replacement on south, east, and north halls
•·   Exterior classroom door replacement
•·   Carpet replacement
•·   Remodel science rooms
•·   Locker replacement
•·   Window replacement
•·   Interior door replacement
•·   Greenhouse window replacement
•·   Masonry restoration - west hall
•·   Swimming pool ventilation replacement
•·   Lighting replacement in south hall hallway
•·   Plumbing fixture replacement
•·   Additional computer outlets in classrooms
•·   Technology upgrades

Site Improv ements

•·   Re-pave parking lots
•·   Replace visitor bleachers with ADA-approved bleachers